• → European Space Agency

      • Space for Europe
      • Space News
      • Space in Images
      • Space in Videos
    • About Us

      • Welcome to ESA
      • DG's News and Views
      • For Member State Delegations
      • Business with ESA
      • ESA Exhibitions
      • ESA Publications
      • Careers at ESA
    • Our Activities

      • Space News
      • Observing the Earth
      • Human Spaceflight
      • Launchers
      • Navigation
      • Space Science
      • Space Engineering
      • Operations
      • Technology
      • Telecommunications & Integrated Applications
    • For Public

    • For Media

      • Media
      • ESA TV
      • Videos for professionals
      • Photos
    • For Educators

    • For Kids

    • ESA

    • Space in Images

    ESA > Space in Images > 2007 > 09 > Mating Herschel's cryostat and service module

    Free Search (11099 images)

    Mating Herschel's cryostat and service module

    (998.00 kB)

    Views: 40
    Rating: 0.00/5 (0 votes cast)

    Rate this Image

    • Currently 0 out of 5 Stars.
    • 1
    • 2
    • 3
    • 4
    • 5

    Thank you for rating!

    You have already rated this page, you can only rate it once!

    Your rating has been changed, thanks for rating!

    Share this Image

    Post to Facebook Post to MySpace Post to Delicious Post to Digg Post to Twitter

    Details

    Open/Close
    • Title Mating Herschel's cryostat and service module
    • Released 19/09/2007 9:53 am
    • Copyright ESA - P. Dumas 2007
    • Description

      This picture was taken on 11 September during the mating of Herschel's cryostat (an important part of the payload module) and the service module at Astrium's facilities in Friedrichshafen. All that is now left to complete the spacecraft is the solar array and its telescope.

      The cryostat contains the sensitive instrument detectors cooled down to about -273ºC (0.3 degrees above absolute zero). The service module is the spacecraft’s heart, which keeps the spacecraft going by caring for all its vital functions. It also carries the ‘warm’ instrument units – those that do not require cooling with the cryostat.

      Between late July and early August this year, the cold and warm units of the instruments were mated with the cryostat and the service module respectively.

      On 11 September, the cryostat containing the cold instrument units was finally mounted on the service module, mating Herschel’s heart and brain.

      This fundamental step will be followed by functional and compatibility testing at Astrium before the spacecraft is sent to ESA’s European Space Research and Technology Centre (ESTEC) in November for final environmental (thermal, mechanical, acoustic) and functional acceptance tests.

      In late December 2007 or early 2008, after the functional tests, the telescope and the solar arrays – two other fundamental parts of the payload module - will be mated to the rest of the spacecraft, completing Herschel.


    TAGS

    Open/Close
    • Click on the tags to find the matching images.
    • Activity Space Science , Space Engineering
    • Mission Herschel
    • Keywords Spacecraft engineering , Construction

    TAGS

    Open/Close

    Details

    Open/Close

    RELATED IMAGES

    • Mating of Herschel's cryostat and service module
      Mating Herschel's cryostat and service module
      Released: 19/09/2007
      Rating
    • Mating Herschel's cryostat and service module
      Mating of Herschel's cryostat and service module
      Released: 19/09/2007
      Rating

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Facebook
    • Livestream
    • Subscribe
    • App Store
    • LATEST ARTICLES
    • · The fast winds of Venus are gett…
    • · ExoMars 2016 set to complete con…
    • · Herschel ends operations as orbi…
    • · Europe’s space hub to open its d…
    • · Europe’s largest spaceship reac…
    • FAQ

    • Jobs at ESA

    • Site Map

    • Contacts

    • Terms and conditions