Free Search (10912 images)
MONTH: 2007 / 12 (110 IMAGES)
- Balancing Jules Verne's Integrated Cargo Carrier
- Released: 02/01/2008 5:07 pm
- The main cryogenic stage for Jules Verne's Ariane 5 ES launch vehicle arrives in the Launcher Integration Building
- Released: 02/01/2008 5:04 pm
- Loading dry cargo into Jules Verne's pressurized module
- Released: 02/01/2008 4:55 pm
- Jules Verne's Propulsion Module is rotated to vertical ahead of mating with the spacecraft's Integrated Cargo Carrier
- Released: 21/12/2007 11:32 am
- The two halves of the Jules Verne spacecraft are mated at Europe's Spaceport in Kourou, French Guiana
- Released: 02/01/2008 5:11 pm
- Loading dry cargo into Jules Verne's pressurized module
- Released: 02/01/2008 4:57 pm
- ATV's docking mechanism is covered with protective outer layer
- Released: 02/01/2008 4:50 pm
- Flying operations to fix a component to the top of the Jules Verne spacecraft
- Released: 02/01/2008 5:09 pm
- Jules Verne's dry cargo hold is thoroughly cleaned
- Released: 02/01/2008 4:47 pm